Hector Rail will test locomotives from Austrian State Railways (ÖBB)

Hector Rail will make test runs in Sweden with two locomotives from Austrian State Railways. The locomotives are 1012.002 and 1142.588. The first tests will take place in mid Sweden at the end of October. The locomotives will leave Austria this evening (October 10). The 1012 locomotives were made in only three units in 1996. The locomotives are modern AC locomotives with a maximum power of 6400 kW. The 1142 locomotives are Austrian standard locomotives built between 1969 and 1977. They have been modernised during the 1990's. The maximum power is 4000 kW. The two locomotives (1012.002 and 1142.588) in Linz before departure.
Read More

Scand Fibre Logistics operations started

On Sunday June 12, 2005 the Scand Fibre Logistics operations started. This means Hector Rail will run trains between Hallsberg and Piteå, Frövi, Norrköping and Grums-Gothenburg. The operations will add up to a total of 1.5 million train kilometres per year. Together with the Euroshuttle business Hector Rail will operate almost 2 million train kilometres per year, corresponding to approximately five percent of the total number of freight train kilometres in Sweden. Hector Rail now has 32 train drivers employed and five of its 161 locomotives in operation.
Read More