HECTORRAIL

SCA Skog increases volumes with Hector Rail

Since January 2008 Hector Rail runs almost 2 million cubic meters of timber per year for the customer SCA Skog in mid Norrland, the so-called Töva system. This system connects the timber terminals in the hinterland with the SCA mills Östrand and Ortviken (Sundsvall area) and also external mills in Iggesund and Örnsköldsvik / Husum. This operation will now be increased in capacity by approximately 15%.

Since its inception, Hector Rail has in this operation engaged a total of seven electric locomotives, one diesel locomotive and 94 four-axle timber wagons in the traffic for SCA. Every train load means approximately 2000 tonnes of timber, which corresponds to 50 units of 24-meter timber trucks (it would be a queue of 1.2 km if the trucks would be standing right next to each other).

The increased capacity is expected to be in place this summer and means in addition to new wagons, one additional electric and one additional diesel locomotives and a number of additional drivers


News

Hector Rail buys high speed locomotives
2010-08-12
Hector Rail is buying one locomotive from MRCE (Mitsui Rail Capital...
Read more

SCA Skog increases volumes with Hector Rail
2010-04-23
Since January 2008 Hector Rail runs almost 2 million cubic meters o...
Read more

1000 trains connecting Scandinavia and the Continent via Denmark
2010-02-26
Hector Rail has by now operated more than 1000 trains through Denma...
Read more


More news in our archive